Buyer Guide

The Swiss Event Calendar and What It Means for Your Order Date

The Swiss year has two clear windows for outdoor work: the summer season around the 1 August national day, and the Advent season from late November. Add the trade fair calendar — Art Basel every June, OLMA in St. Gallen in October — and the deadlines set themselves. Bulk production typically takes 3–8 days for simple items, 7–15 days for standard custom work and 15–25 days for complex or large pieces, counted from final design approval, freight on top, so a complex piece for an August installation is approved in early May.

By InflatCraft Product Team Last updated

The fixed dates

Swiss National Day falls on 1 August and is a public holiday nationwide, which makes it the most predictable anchor in the calendar. Campaigns built around it are planned a year ahead without much risk.

The Advent season is the other reliable window. The Basel Christmas Market runs from late November to shortly before Christmas, and similar markets across the country follow roughly the same weeks.

The trade fair calendar

Art Basel fills the city every June and takes hotel, crew and logistics capacity with it. OLMA, the agriculture and food fair, does the same for St. Gallen in October.

For a stand piece, the exhibitor manual rather than the show date sets the real deadline: technical documentation is usually due weeks before move-in.

From event date to order date

Bulk production typically takes 3–8 days for simple items, 7–15 days for standard custom work and 15–25 days for complex or large pieces, counted from final design approval. Freight comes on top: express or air usually 4–15 working days, and sea, rail or truck usually 20–45 days, after dispatch and subject to route and customs

As a planning estimate, approve artwork about 12 weeks before installation for a complex piece shipped by sea, or about 7 weeks by air. Working back from 1 August, that means early May for sea freight and mid-June for air.

Where the weather enters the plan

Above roughly 1,200–1,500 m, winter precipitation falls mainly as snow and can cover the ground for weeks or months. An Advent market piece therefore lives in cold, often snowy conditions for weeks, which is a specification question as much as a scheduling one.

Foehn, a warm dry wind, occurs in Alpine valleys; southerly foehn is most frequent in April and May. For a spring installation in an Alpine valley, that is worth raising with the venue when the shutdown plan is agreed.

Repeat and multi-city campaigns

MOQ is 1 piece for most custom projects, so one piece can be approved and reviewed before a larger run. Pattern and print setup are paid once per design, so a second unit for another city costs less per piece.

For a campaign across Zurich, Geneva and Basel, each unit is packed and labelled by destination city, and the language of the approval file may differ by canton.

Verified Specifications

Figures this guide is written against.

Lead time

  • Typical: Bulk production typically takes 3–8 days for simple items, 7–15 days for standard custom work and 15–25 days for complex or large pieces, counted from final design approval
  • Can be shorter: Repeat orders on an approved design can run shorter
  • Freight and import time come on top. Lead time is confirmed per project once artwork, size, quantity and destination are fixed; treat any figure quoted before that as indicative.

Relevant Product Pages

Compare specifications before submitting an RFQ.

Buyer FAQ

Additional specification questions.

Where to order

Order direct from the manufacturer.

Published by InflatCraft, operated by Tianjin Mufeng Trading Co., Ltd., a custom inflatable manufacturer founded in 2005 and based in Tianjin, China. We export to the United States, United Kingdom, Canada, Australia, Germany, France, Spain and Italy.

Export planning by country: United States, United Kingdom, Canada, Australia, Germany, France, Spain, Italy.

Specification Review

Ready to confirm your product requirements?

Quote Form

Ask About This Project

Send the product type, size, quantity, artwork status, destination and date. We reply with production questions and a quotation path.

Start with four essentials: product type, rough size, quantity, and one way to contact you.

Country, timing, artwork, and technical details are optional at this stage. We will request anything else needed for a usable factory quote.

Contact details *

Add an email address or WhatsApp / phone number. One contact method is enough.

Optional details

Add only what you know

Reference images and artwork can be shared by email or WhatsApp after we reply. This form does not include a file upload field.

AI Sourcing Guide

Use ChatGPT, Gemini, or Claude to build a cleaner RFQ before you send it to the factory.

AI works best when the brief is structured. This guide turns rough notes into a supplier-ready checklist, then sends you toward the RFQ form, factory verification, and the buyer questions that usually decide the quote.

Get Quote