The Mexican Retail Calendar: Buen Fin, Día de Muertos and Your Order Date
The Mexican year loads its retail weight into the autumn: Independence Day on 16 September, Día de Muertos on 1–2 November and El Buen Fin in mid-November, one after another. Bulk production typically takes 3–8 days for simple items, 7–15 days for standard custom work and 15–25 days for complex or large pieces, counted from final design approval, freight and customs on top, so a complex piece for Buen Fin is approved in late August.
By InflatCraft Product Team • Last updated

The autumn cluster
Three peaks land in roughly eight weeks: Independence Day on 16 September, Día de Muertos on 1–2 November and El Buen Fin in mid-November. For a retailer that is one continuous campaign season; for a supplier it is a capacity crunch.
The consequence is practical. A design approved in October for Buen Fin is competing for the same production slots and the same freight space as everyone else's. The brands that get the schedule they want approve in August.
The trade fairs
Expo Publicitas is held at Centro Banamex in Mexico City every May, and Expo ANTAD runs annually in Guadalajara for the retail trade. Both are stand-build events, which means the exhibitor manual sets the documentation deadline rather than the show date.
From event date to order date
Bulk production typically takes 3–8 days for simple items, 7–15 days for standard custom work and 15–25 days for complex or large pieces, counted from final design approval. Freight comes on top: express or air usually 4–15 working days, and sea, rail or truck usually 20–45 days, after dispatch and subject to route and customs Then add the customs sequence, which for a first-time importer includes the Padrón registration.
As a planning estimate, approve artwork about 12 weeks before installation for a complex piece shipped by sea, or about 7 weeks by air. Working back from El Buen Fin, that is late August for sea freight and late September for air.
The rainy season overlaps the planning window
Across most of Mexico the rainy season runs from May to October, when up to 80% of annual rain falls.
Campaigns installed between May and October are planned with that in mind: material, seams, blower position and a covered power connection are reviewed for the actual site, and a weather shutdown plan is agreed with the organiser.
Multi-city and repeat campaigns
MOQ is 1 piece for most custom projects, so one unit can be approved before a larger run, and pattern and print setup are paid once per design. A campaign across Mexico City, Guadalajara and Monterrey is packed and labelled by destination city.
A design approved this year can be repeated next year without new pattern work, which is what makes the second Buen Fin cheaper than the first.
Verified Specifications
Figures this guide is written against.
Lead time
- Typical: Bulk production typically takes 3–8 days for simple items, 7–15 days for standard custom work and 15–25 days for complex or large pieces, counted from final design approval
- Can be shorter: Repeat orders on an approved design can run shorter
- Freight and import time come on top. Lead time is confirmed per project once artwork, size, quantity and destination are fixed; treat any figure quoted before that as indicative.
Sourcing and Ordering Guides
More on quoting, terms and shipping.
Importing Custom Inflatables into the US
Who acts as importer of record, how a custom inflatable is classified under the HTS, where Section 301 sits, and how to time the entry against an event date.
US Venue and Permit Rules for Custom Inflatables
There is no single national rule. What the venue, the local permit office and the event insurer each ask for, and which documents the supplier provides.
US Event Calendar and Ordering Timeline
Independence Day, the autumn retail run and the trade show season, turned into artwork approval dates you can put in a project plan.
Importing Custom Inflatables into the UK
What a UK import of a custom inflatable involves: the GB EORI number, the commodity code, 20% import VAT on the landed value, and where the schedule slips.
Compare sizes, materials and air systems on the custom advertising inflatable product range page before sending an RFQ.
Relevant Product Pages
Compare specifications before submitting an RFQ.
Buyer FAQ
Additional specification questions.
Mid-November, and it is the biggest retail weekend of the Mexican year. Día de Muertos on 1–2 November sits immediately before it.
Approve artwork about 12 weeks before installation for a complex piece shipped by sea, which is late August, or about 7 weeks by air, which is late September.
Expo Publicitas at Centro Banamex in Mexico City every May, and Expo ANTAD in Guadalajara for the retail trade. The exhibitor manual sets the documentation deadline.
Across most of Mexico the rainy season runs from May to October, when up to 80% of annual rain falls. Material, seams, blower position and a covered power connection are reviewed for the site, with a shutdown plan agreed with the organiser.
Yes. MOQ is 1 piece for most custom projects, pattern and print setup are paid once per design, and each unit is packed and labelled by destination city.
The importer registration. It is a one-off step but not an instant one, and it should start while the piece is still in production.
Where to order
Order direct from the manufacturer.
Published by InflatCraft, operated by Tianjin Mufeng Trading Co., Ltd. in Tianjin, China. Product configuration, supply scope and supporting documents are confirmed for each project.
Request a quote
Send the brief and get a specification-based quotation.
MOQ and lead time
What sets the minimum order and where the time goes.
Sourcing from China
Brief, approval, Incoterms, freight and import, in order.
Verified specifications
Materials, air systems and lead time this site quotes against.
Export planning by country: