SABER and SALEEM: What Saudi Conformity Certificates Mean for an Inflatable Order
Products imported into Saudi Arabia are registered on the SABER platform, where a product and a shipment certificate of conformity are issued under the SALEEM programme before customs clearance. VAT is charged at 15% on imports, and customs duty follows the GCC tariff for the confirmed code. In practice that means two things happen in sequence: the product is registered and a product certificate of conformity is issued, then each shipment gets its own shipment certificate before it can clear. Both are issued through approved conformity assessment bodies, not by the factory, and the importer drives the process. Start it before the goods are ready, not when they reach the port.
By InflatCraft Product Team • Last updated

What the two certificates are
Products imported into Saudi Arabia are registered on the SABER platform, where a product and a shipment certificate of conformity are issued under the SALEEM programme before customs clearance. VAT is charged at 15% on imports, and customs duty follows the GCC tariff for the confirmed code.
The product certificate is about the item: it says this product, as described, meets the applicable technical requirements. The shipment certificate is about a specific consignment and references the product certificate. Customs clearance needs the shipment certificate, which is why a valid product registration on its own does not get the goods released.
Both are issued by conformity assessment bodies approved for the purpose. The factory's role is to supply accurate technical information — materials, construction, the electrical specification of the blower — and to make sure the invoice and packing list describe the same product that was registered.
Where the process usually stalls
Mismatched descriptions. If the registration describes one thing and the commercial invoice another, the shipment certificate cannot be matched to it. Agree the exact product description with the importer before the invoice is issued, and keep it identical across the registration, the invoice and the packing list.
The second common stall is treating the blower as an accessory. It is electrical equipment, so it carries its own requirements, and a shipment where the fabric body is registered but the pump is not can sit while that gap is closed.
The third is timing. Registration is not instant, and it is the importer's account that does it. If the importer is a newly appointed agency rather than an established distributor, add time for them to get set up.
Duty, VAT and the landed figure
VAT is charged at 15% on imports, and customs duty follows the GCC tariff for the confirmed code. As with any inflatable, the body, the blower, lighting and accessories can classify differently, so the code is confirmed by the importer or a licensed broker from the materials, use and photographs rather than assumed from a catalogue line.
A DDP arrangement is reviewed by quotation rather than offered as standard, because the conformity registration sits with the importer and cannot simply be transferred to the supplier.
Fitting it into the production schedule
Bulk production typically takes 3–8 days for simple items, 7–15 days for standard custom work and 15–25 days for complex or large pieces, counted from final design approval. Freight comes on top: express or air usually 4–15 working days, and sea, rail or truck usually 20–45 days, after dispatch and subject to route and customs
Run the conformity steps in parallel with production rather than after it. The technical details needed for registration are fixed at design approval, which is weeks before the goods exist, so there is no reason for the certificate work to start at dispatch.
Working back from Saudi National Day on 23 September, that means approving artwork by early July for a complex piece shipped by sea, or by early August for air freight.
What to send for a quote
Product type, target size, quantity, print-ready artwork, destination city, event date, and who will act as importer. If the importer already has a SABER account and a preferred conformity assessment body, say so: it shortens the sequence and it tells the supplier which technical file format to prepare.
Verified Specifications
Figures this guide is written against.
Lead time
- Typical: Bulk production typically takes 3–8 days for simple items, 7–15 days for standard custom work and 15–25 days for complex or large pieces, counted from final design approval
- Can be shorter: Repeat orders on an approved design can run shorter
- Freight and import time come on top. Lead time is confirmed per project once artwork, size, quantity and destination are fixed; treat any figure quoted before that as indicative.
Sourcing and Ordering Guides
More on quoting, terms and shipping.
Saudi Event Approvals for Inflatable Installations
The layered approvals behind a Saudi event — municipal site permit, event licensing and entertainment permits — and what the inflatable supplier is asked to provide.
Saudi Event Calendar and Ordering Timeline
Riyadh Season, Founding Day, National Day and the Riyadh show calendar, turned into artwork approval dates you can put in a project plan.
What Affects the Cost of a Custom Inflatable?
A practical guide to the main factors that shape a custom inflatable quote, including material, size, complexity, accessories, artwork, quantity, and shipping.
Custom Inflatable MOQ Explained
How minimum order quantity is reviewed for custom advertising inflatables, including one-off production, material, accessories, packing, and quantity planning.
Compare sizes, materials and air systems on the custom advertising inflatable product range page before sending an RFQ.
Relevant Product Pages
Compare specifications before submitting an RFQ.
Buyer FAQ
Additional specification questions.
Where to order
Order direct from the manufacturer.
Published by InflatCraft, operated by Tianjin Mufeng Trading Co., Ltd., a custom inflatable manufacturer founded in 2005 and based in Tianjin, China. We export to the United States, United Kingdom, Canada, Australia, Germany, France, Spain and Italy.
Request a quote
Send the brief and get a specification-based quotation.
MOQ and lead time
What sets the minimum order and where the time goes.
Sourcing from China
Brief, approval, Incoterms, freight and import, in order.
Verified specifications
Materials, air systems and lead time this site quotes against.
Export planning by country: United States, United Kingdom, Canada, Australia, Germany, France, Spain, Italy.