Buyer Guide

Importing Custom Inflatables into Germany: EORI, Tariff and 19% VAT

An importer established in the EU, with an EORI number, is responsible for the customs declaration, and the goods are classified under a commodity code in the EU tariff. Import VAT is charged at the German standard rate of 19% in addition to any duty. The requirement buyers miss is the first one: the importer has to be established in the EU. An agency outside the EU cannot simply receive the shipment, and that is a question to settle before the commercial invoice is issued. On freight, express or air usually 4–15 working days, and sea, rail or truck usually 20–45 days, after dispatch and subject to route and customs.

By InflatCraft Product Team Last updated

Unmarked containers on a barge beneath a gantry crane at an inland river terminal

Who can act as importer

An importer established in the EU, with an EORI number, is responsible for the customs declaration, and the goods are classified under a commodity code in the EU tariff. Import VAT is charged at the German standard rate of 19% in addition to any duty.

This is the step that decides the schedule. If the brand already imports, the path is short. If the buyer is an agency producing a campaign, the usual routes are the client's importer or an importer of record service. What does not work is discovering at the port that nobody on the paperwork is established in the EU.

Duty and the 19% on top

Duty is set by the classification; import VAT is charged at the German standard rate in addition to it. A quotation showing only the goods price is therefore not the landed cost, and on a bulky shipment the freight element inside the VAT base is larger than buyers expect.

Ask for the CIF value and the intended incoterm in writing. DDP is reviewed by quotation rather than offered as standard.

Classification is not one line

The fabric body, the electric blower, any lighting and the accessories can each fall under a different commodity code. The importer or a customs agent confirms classification from the materials, the construction, the use and photographs, and it is worth having in writing before the goods move.

The packing list matters here too: freight on an inflatable is charged on volume as much as weight, so ask for packed dimensions, carton count and gross weight in the quotation.

Trade fair shipments have their own clock

The trade fair calendar and the outdoor season drive demand: the Oktoberfest in Munich runs from the Saturday after 15 September to the first Sunday in October, German Unity Day falls on 3 October, and Christmas markets open from late November. Exhibitor manuals set their own deadlines for technical and material documentation, often well before move-in.

That last sentence is the one to act on. A stand-build project is governed by the exhibitor manual, and the documentation deadline it sets is normally well before move-in — often before the piece would otherwise have been ordered.

Timing it against the calendar

Work back from the installation date. Bulk production typically takes 3–8 days for simple items, 7–15 days for standard custom work and 15–25 days for complex or large pieces, counted from final design approval. Working back from German Unity Day on 3 October, that means approving artwork by mid-July for a complex piece shipped by sea, or by mid-August for air freight.

The autumn cluster — Oktoberfest, Unity Day, then the Christmas markets from late November — puts three peaks into a short run, and they compete for the same production and freight capacity.

Verified Specifications

Figures this guide is written against.

Lead time

  • Typical: Bulk production typically takes 3–8 days for simple items, 7–15 days for standard custom work and 15–25 days for complex or large pieces, counted from final design approval
  • Can be shorter: Repeat orders on an approved design can run shorter
  • Freight and import time come on top. Lead time is confirmed per project once artwork, size, quantity and destination are fixed; treat any figure quoted before that as indicative.

Relevant Product Pages

Compare specifications before submitting an RFQ.

Buyer FAQ

Additional specification questions.

Where to order

Order direct from the manufacturer.

Published by InflatCraft, operated by Tianjin Mufeng Trading Co., Ltd., a custom inflatable manufacturer founded in 2005 and based in Tianjin, China. We export to the United States, United Kingdom, Canada, Australia, Germany, France, Spain and Italy.

Export planning by country: United States, United Kingdom, Canada, Australia, Germany, France, Spain, Italy.

Specification Review

Ready to confirm your product requirements?

Quote Form

Ask About This Project

Send the product type, size, quantity, artwork status, destination and date. We reply with production questions and a quotation path.

Start with four essentials: product type, rough size, quantity, and one way to contact you.

Country, timing, artwork, and technical details are optional at this stage. We will request anything else needed for a usable factory quote.

Contact details *

Add an email address or WhatsApp / phone number. One contact method is enough.

Optional details

Add only what you know

Reference images and artwork can be shared by email or WhatsApp after we reply. This form does not include a file upload field.

AI Sourcing Guide

Use ChatGPT, Gemini, or Claude to build a cleaner RFQ before you send it to the factory.

AI works best when the brief is structured. This guide turns rough notes into a supplier-ready checklist, then sends you toward the RFQ form, factory verification, and the buyer questions that usually decide the quote.

Get Quote