Buyer Guide

The Spanish Event Calendar and What It Means for Your Order Date

The outdoor and fiesta season is long, with peaks in spring and summer. Las Fallas in Valencia runs from 15 to 19 March, and 12 October is the Fiesta Nacional de España, set by Ley 18/1987. Bulk production typically takes 3–8 days for simple items, 7–15 days for standard custom work and 15–25 days for complex or large pieces, counted from final design approval, with freight and customs on top. Working back from the Fiesta Nacional on 12 October, that means approving artwork by late July for a complex piece shipped by sea, or by late August for air freight.

By InflatCraft Product Team • Last updated

Two fixed dates at opposite ends of the year

The outdoor and fiesta season is long, with peaks in spring and summer. Las Fallas in Valencia runs from 15 to 19 March, and 12 October is the Fiesta Nacional de España, set by Ley 18/1987.

That shape is unusual and it changes the planning. Most markets have one ordering season; Spain effectively has two, because a March installation and an October one are briefed six months apart and compete with different queues.

The March problem

Las Fallas falls in the middle of March. Working back with production and freight, that puts artwork approval before the end of the previous year — in the weeks when a buyer is closing the current year rather than planning the next.

A campaign for it that starts in January is already late. This is the single most common way a Spanish project misses its date.

Working the dates backwards

Bulk production typically takes 3–8 days for simple items, 7–15 days for standard custom work and 15–25 days for complex or large pieces, counted from final design approval. Freight comes on top: express or air usually 4–15 working days, and sea, rail or truck usually 20–45 days, after dispatch and subject to route and customs. Clearance is a separate step.

Working back from the Fiesta Nacional on 12 October, that means approving artwork by late July for a complex piece shipped by sea, or by late August for air freight.

The site decides the specification

Summer heat and sun exposure are intense inland and in the south, while coastal sites add wind and salt air. An inland summer installation and a coastal one are different material and fixing problems, and the hardware travels with the order.

Say whether the site is inland or coastal, paved or sand, and how long the piece will stand.

What to send so the date is real

The product type, the target size or the constraint that fixes it, the quantity, print-ready artwork with colour references, the destination city, indoor or temporary outdoor use, and the on-site date. MOQ is 1 piece for most custom projects, so a first piece can be reviewed before a repeat order.

Name the autonomous community as well as the city. It changes which rules the organiser is working to, and therefore which documents the supplier is asked for.

Verified Specifications

Figures this guide is written against.

Lead time

  • Typical: Bulk production typically takes 3–8 days for simple items, 7–15 days for standard custom work and 15–25 days for complex or large pieces, counted from final design approval
  • Can be shorter: Repeat orders on an approved design can run shorter
  • Freight and import time come on top. Lead time is confirmed per project once artwork, size, quantity and destination are fixed; treat any figure quoted before that as indicative.

Relevant Product Pages

Compare specifications before submitting an RFQ.

Buyer FAQ

Additional specification questions.

Where to order

Order direct from the manufacturer.

Published by InflatCraft, operated by Tianjin Mufeng Trading Co., Ltd., a custom inflatable manufacturer founded in 2005 and based in Tianjin, China. We export to the United States, United Kingdom, Canada, Australia, Germany, France, Spain and Italy.

Export planning by country: United States, United Kingdom, Canada, Australia, Germany, France, Spain, Italy.

Specification Review

Ready to confirm your product requirements?

Quote Form

Ask About This Project

Send the product type, size, quantity, artwork status, destination and date. We reply with production questions and a quotation path.

Start with four essentials: product type, rough size, quantity, and one way to contact you.

Country, timing, artwork, and technical details are optional at this stage. We will request anything else needed for a usable factory quote.

Contact details *

Add an email address or WhatsApp / phone number. One contact method is enough.

Optional details

Add only what you know

Reference images and artwork can be shared by email or WhatsApp after we reply. This form does not include a file upload field.

AI Sourcing Guide

Use ChatGPT, Gemini, or Claude to build a cleaner RFQ before you send it to the factory.

AI works best when the brief is structured. This guide turns rough notes into a supplier-ready checklist, then sends you toward the RFQ form, factory verification, and the buyer questions that usually decide the quote.

Get Quote